1 |
Parallelized Bi-level optimization model with continuous search domain for selection of run-of-river hydropower projects Abdelhady HU, Imam YE, Shawwash Z, Ghanem A Renewable Energy, 167, 116, 2021 |
2 |
Variable Speed Hydropower Conversion and Control Reigstad TI, Uhlen K IEEE Transactions on Energy Conversion, 35(1), 386, 2020 |
3 |
Complementing hydroelectric power with fl oating solar PV for daytime peak electricity demand Rauf H, Gull MS, Arshad N Renewable Energy, 162, 1227, 2020 |
4 |
Run-of-river hydro generation in presence of sub-daily source flow variations Roy S Energy, 172, 1268, 2019 |
5 |
Risk evaluation and prevention in hydropower plant operations: A model based on Pythagorean fuzzy AHP Yucesan M, Kahraman G Energy Policy, 126, 343, 2019 |
6 |
Long-term sustainability assessment of micro-hydro projects: Case studies from Venezuela Lopez-Gonzalez A, Ferrer-Marti L, Domenech B Energy Policy, 131, 120, 2019 |
7 |
Influence of climatological data records on design of a standalone hybrid PV-hydroelectric power system Shabani M, Mahmoudimehr J Renewable Energy, 141, 181, 2019 |
8 |
Use of floating PV plants for coordinated operation with hydropower plants: Case study of the hydroelectric plants of the Sao Francisco River basin Silverio NM, Barros RM, Tiago GL, Redon-Santafe M, dos Santos IFS, Valerio VED Energy Conversion and Management, 171, 339, 2018 |
9 |
Analytical Model of Small Hydropower Plant Working at Variable Speed Borkowski D IEEE Transactions on Energy Conversion, 33(4), 1886, 2018 |
10 |
The Effect of Surge Tank Throttling on Governor Stability, Power Control, and Hydraulic Transients in Hydropower Plants Vereide K, Svingen B, Nielsen TK, Lia L IEEE Transactions on Energy Conversion, 32(1), 91, 2017 |