검색결과 : 5건
No. | Article |
---|---|
1 |
Mean time between failure Nesbitt B Hydrocarbon Processing, 81(3), 34, 2002 |
2 |
Piping design Nesbitt B Hydrocarbon Processing, 81(9), 41, 2002 |
3 |
Worthy of respect? Nesbitt B Chemical Engineer-London(691), 26, 1999 |
4 |
The 5-Minute Chemical-Engineer Nesbitt B Hydrocarbon Processing, 75(4), 55, 1996 |
5 |
Brent-Spar or Broken-Spur Elderfield H, Schultz A, James R, Dickson P, Greaves M, Mills R, Cowan D, Nesbitt B Nature, 376(6537), 208, 1995 |