검색결과 : 3건
No. | Article |
---|---|
1 |
Primary control reserve of electric power by feedwater flow rate change through an additional economizer - A case study of the thermal power plant "Nikola Tesla B" Stevanovic VD, Ilic M, Djurovic Z, Wala T, Muszynski S, Gajic I Energy, 147, 782, 2018 |
2 |
Efficiency and power upgrade by an additional high pressure economizer installation at an aged 620 MWe lignite-fired power plant Stevanovic VD, Wala T, Muszynski S, Milic M, Jovanovic M Energy, 66, 907, 2014 |
3 |
Modification of the BB-1150 boiler firing system for reduction of NOx emission Andryjowicz C, Hardy T, Kordylewski W, Modlinski Z, Przegalnski K, Raczka P, Wala T Inzynieria Chemiczna i Procesowa, 25(4), 2071, 2004 |