화학공학소재연구정보센터
검색결과 : 11건
No. Article
1 Innovative process for biogas upgrading with CO2 storage: Results from pilot plant operation
Baciocchi R, Carnevale E, Corti A, Costa G, Lombardi L, Oliuieri T, Zanchi L, Zingaretti D
Biomass & Bioenergy, 53, 128, 2013
2 Economic evaluations of an innovative biogas upgrading method with CO2 storage
Lombardi L, Carnevale E
Energy, 62, 88, 2013
3 Incubation of air-pollution-control residues from secondary Pb smelter in deciduous and coniferous organic soil horizons: Leachability of lead, cadmium and zinc
Chrastny V, Vanek A, Komarek M, Farkas J, Drabek O, Vokurkova P, Nemcova J
Journal of Hazardous Materials, 209, 40, 2012
4 Alkali activated solidification/stabilisation of air pollution control residues and co-fired pulverised fuel ash
Shirley R, Black L
Journal of Hazardous Materials, 194, 232, 2011
5 Properties of sintered glass-ceramics prepared from plasma vitrified air pollution control residues
Roether JA, Daniel DJ, Rani DA, Deegan DE, Cheeseman CR, Boccaccini AR
Journal of Hazardous Materials, 173(1-3), 563, 2010
6 Long-term leaching from MSWI air-pollution-control residues: Leaching characterization and modeling
Hyks J, Astrup T, Christensen TH
Journal of Hazardous Materials, 162(1), 80, 2009
7 Expansion of cohesive gas fluidized binary solid systems
Scuzzarella A, Bertos MF, Simons SJ, Hills CD, Carey PJ
Powder Technology, 163(1-2), 18, 2006
8 Investigation on assisted fluidization of a cohesive powder
Scuzzarella A, Simons SJR, Hills CD, Carey PJ
Chemical Engineering Research & Design, 83(A11), 1319, 2005
9 Leaching of APC residues from secondary Pb metallurgy using single extraction tests: the mineralogical and the geochemical approach
Ettler V, Mihaljevic M, Sebek O, Strnad L
Journal of Hazardous Materials, 121(1-3), 149, 2005
10 Comparison of immobilisation of air pollution control residues with cement and with silica
Geysen D, Vandecasteele C, Jaspers M, Wauters G
Journal of Hazardous Materials, 107(3), 131, 2004