1 |
Parallelized Bi-level optimization model with continuous search domain for selection of run-of-river hydropower projects Abdelhady HU, Imam YE, Shawwash Z, Ghanem A Renewable Energy, 167, 116, 2021 |
2 |
Integer programming to optimize Micro-Hydro Power Plants for generic river profiles Tapia A, Millan P, Gomez-Estern E Renewable Energy, 126, 905, 2018 |
3 |
Sensitivity analysis of a Pelton hydropower station based on a novel approach of turbine torque Xu BB, Yan DL, Chen DY, Gao X, Wu CZ Energy Conversion and Management, 148, 785, 2017 |
4 |
Hamiltonian modeling of multi-hydro-turbine governing systems with sharing common penstock and dynamic analyses under shock load Xu BB, Wang FF, Chen DY, Zhang H Energy Conversion and Management, 108, 478, 2016 |
5 |
Power-frequency control of hydropower plants with long penstocks in isolated systems with wind generation Martinez-Lucas G, Sarasua JI, Sanchez-Fernandez JA, Wilhelmi JR Renewable Energy, 83, 245, 2015 |
6 |
A dimensional analysis for determining optimal discharge and penstock diameter in impulse and reaction water turbines Leon AS, Zhu L Renewable Energy, 71, 609, 2014 |
7 |
Pico hydro - Reducing technical risks for rural electrification Williams AA, Simpson R Renewable Energy, 34(8), 1986, 2009 |
8 |
Optimum penstocks for low head microhydro schemes Alexander KV, Giddens EP Renewable Energy, 33(3), 507, 2008 |