12 - 12 |
Changing perspectives Craig D |
18 - 18 |
Fields of vision Millheim KK |
30 - 32 |
Diverless, subsea, slickline well intervention [Anonymous] |
34 - 35 |
Downhole video technology in multilateral-well completions [Anonymous] |
38 - 40 |
Cost-efficient well interventions : Advanced slickline technology [Anonymous] |
41 - 43 |
Coiled-tubing resin squeeze to mitigate water production [Anonymous] |
46 - 49 |
Converting the Yme field from conventional-rig to coiled-tubing operations [Anonymous] |
51 - 52 |
Wireline well tractor [Anonymous] |
53 - 56 |
Coiled-tubing operations from a vessel [Anonymous] |
59 - 61 |
Internal coiled-tubing connector from permanent-packer technology [Anonymous] |
62 - 65 |
Enhancing the effectiveness of management systems through a TQM approach Kennedy JS |
70 - 73 |
Acoustic-velocity signatures associated with rock-deformation processes Scott TE, Zaman MM, Roegiers JC |
75 - 76 |
Formation breakdown during well control : Underground crossflow while drilling an HP/HT well [Anonymous] |
77 - 78 |
Pressure measurement during HP/HT drilling [Anonymous] |
79 - 80 |
Successful water shutoff in a high-temperature, high-volume producer [Anonymous] |
84 - 85 |
High-pressure/high-temperature platform wellheads and Christmas trees [Anonymous] |
86 - 87 |
High-pressure/high-temperature seals for oil and gas production [Anonymous] |
88 - 89 |
Development and field application of a delayed-breaker system for use at high temperatures [Anonymous] |
90 - 91 |
Proppant-flowback control in high-temperature wells [Anonymous] |
92 - 93 |
System design for buried high-pressure/high-temperature pipelines [Anonymous] |