IEEE Transactions on Energy Conversion, Vol.22, No.1, 79-85, 2007
Kriegers flak 640 MW off-shore wind power grid connection - A real project case study
This paper reports on the feasibility study performed to investigate the possibilities of connecting the 640-MW off-shore wind power farm, planned for Kriegers Flak 30 km south of Trelle-borg, to the E.ON 130-kV subtransmission system. The Kriegers Flak commissioning is planned for 2010. The aim of this study is to answer the question if such a connection is possible, and under what conditions; it is not meant as a design project. Following a general connection design discussion, the study comprises of three major parts: fault current calculations, load flow calculations, and dynamic simulations. The study shows that it is possible to connect such a large off-shore wind power farm to the 130-kV subtransmission system, but reinforcement concerning load currents during normal operation and fault currents have to be made.