Energy, Vol.86, 539-547, 2015
Comparing the life cycle costs of using harvest residue as feedstock for small- and large-scale bioenergy systems (part II)
In part II of our two-part study, we estimate the nominal electricity generation and GHG (greenhouse gas) mitigation costs of using harvest residue from a hardwood forest in Ontario, Canada to fuel (1) a small-scale (250 kW(e)) combined heat and power wood chip gasification unit and (2) a large-scale (211 MWe) coal-fired generating station retrofitted to combust Wood pellets. Under favorable operational and regulatory conditions, generation costs are similar: 14.1 and 14.9 cents per kWh (c/kWh) for the small- and large-scale facilities, respectively. However, GHG mitigation costs are considerably higher for the large-scale system: $159/tonne of CO2 eq., compared to $111 for the small-scale counterpart. Generation costs increase substantially under existing conditions, reaching: (1) 25.5 c/kWh for the small-scale system, due to a regulation mandating the continual presence of an operating engineer; and (2) 22.5 c/kWh for the large-scale system due to insufficient biomass supply, which reduces plant capacity factor from 34% to 8%. Limited inflation adjustment (50%) of feed-in tariff rates boosts these costs by 7% to 11%. Results indicate that policy generalizations based on scale require careful consideration of the range of operational/regulatory conditions in the jurisdiction of interest. Further, if GHG mitigation is prioritized, small-scale systems may be more cost-effective. (C) 2015 Elsevier Ltd. All rights reserved.