Neftyanoe Khozyaistvo, No.6, 19-20, 1999
Drilling of horizontal side-tracks from 146mm production casing
Analyzes is made on pressure losses during drilling of additional 120,6mm. 124mm and 125mm side-tracks on Udmurt oil fields. Obtained are results, useful and interesting for personnel, engaged in drilling and work-over of oil and gas wells.