Cooling tower maintenance at the Neckar I Nuclear Power Plant
Since the starting operation of the Power Station GKN I (Joint Nuclear Power Station Neckar I) in the year 1976, the cell cooler of the plant was, except for those cases in which continuous-flow cooling was possible, continually in operation. Aim of the restoration, after an operational time of If years, is a further constructional and thermal service life of about 15 to 20 years.