Bioresource Technology, Vol.97, No.14, 1640-1649, 2006
Start-up alternatives and performance of an UASB pilot plant treating diluted municipal wastewater at low temperature
Different start-up procedures of an upflow anaerobic sludge bed (UASB) digester were carried out. Start-up without inoculum (experiment A) was delayed for about 120 day. The digester reached 75-85% total suspended solids (TSS) removal, 54-58% total chemical oxygen demand (TCOD) removal and 63-73% biological oxygen demand (BOD5) removal at influent concentrations of 240-340 mg TCODi l(-1), temperatures of 13.5-15 degrees C and hydraulic retention times (HRT) of 10-11 h. Digested sludge was used as inoculum in experiment B. After the start-up period of 75 days, digester efficiencies were 58%, 41% and 54% for TSS, TCOD and BOD5 removal, respectively, working at 169 mg TCODi l(-1), temperature of 14 degrees C and HRT of 11 h. The sludge bed developed and stabilised quickly when using a hydraulically adapted inoculum (experiment C), but TCOD and BOD5 removals remained low and volatile fatty acids (VFA) accumulated in the effluent. (c) 2005 Elsevier Ltd. All rights reserved.