화학공학소재연구정보센터
Bioresource Technology, Vol.99, No.3, 570-574, 2008
Recovery of protein from discharged wastewater during the production of chitin
Studies were carried out to optimize the conditions for the recovery of protein. The results showed that pH of 6.00 for wastewater, the dosage of 1% chitosan solution in 1% acetic acid aqueous solution of 2.0 ml for 50 ml wastewater and 1% FeCl3 aqueous solution of 2 ml for 50 ml wastewater, the flocculation time of 4.0 h were the optimal conditions for the recovery of protein. The obtained protein sediment contained abundant amino acids, especially isoleucine, methione and lysine that are absent in other protein resource. (c) 2007 Elsevier Ltd. All rights reserved.