화학공학소재연구정보센터
Energy Conversion and Management, Vol.49, No.12, 3458-3467, 2008
A review on the use of gas and steam turbine combined cycles as prime movers for large ships. Part I: Background and design
The aim of the present paper is to review the prospects of using combined cycles as prime movers for large ships, like, container ships, tankers and bulk carriers. The paper is divided into three parts of which this paper constitutes Part I. Here, the environmental and human health concerns of international shipping are outlined. The regulatory framework relevant for shipping and the design of combined cycles are discussed. In Part II, previous work and experience are reviewed, and an overview of the implications of introducing combined cycles as prime movers is included. In Part III, marine fuels are discussed and the pollutant emissions of gas turbines are compared with those of two-stroke, slow-speed diesel engines. Environmental effects of shipping include contributions to the formation of ground-level ozone, acidification, eutrophication and climate impact. Tightening environmental regulations limit the fuel sulphur content and pollutant emissions. For moderate live steam pressures. a vertical HRSG of drum-type mounted directly over the gas turbine, is suggested to be a viable configuration that minimizes ground floor and space requirements. (c) 2008 Elsevier Ltd. All rights reserved.