We propose a new optimization framework for the reactive scheduling. The proposed rescheduling scheme is specially focused on how to generate rescheduling results when equipment breakdowns occur. The approach is based on a continuous-time problem representation that takes into account the schedule in progress, the updated information on the batches still to be processed, the present plant state, the deviations in plant parameters and the time data. To update the predictive scheduling, we used right shift rescheduling and total regeneration when equipment failure. For readjusting the process system after machine failure, we compare objective function with two methods and select method more. And, the efficiency measure that evaluates the satisfaction of a desired objective function value and the stability measure that evaluates the amount of change between the schedules before and after the disruption. In this paper, the efficiency is measured by the makespan of all jobs in the system. And, the stability is measured by the percentage change in makespan and the sequence deviation in the predictive scheduling and rescheduling. |