771 - 771 |
A Conversation with 1997 SPE President Hickman,T.Scott Hickman TS |
794 - 794 |
Open-Loop or Closed-Leap Thinking Millheim KK, Leoben MU |
818 - 818 |
Engineers in the Us Petroleum Production Industry Calhoun JC |
825 - 825 |
Advances in Cement-Plug Procedures Heathman JF |
832 - 832 |
Coring-While-Drilling with One Bit - New Advances in Wireline Retrievable Coring Hall LM, Tyler PG |
833 - 834 |
Coiled-Tubing Window Milling Hearn DD, Blount CG, Kamlowsky PE |
836 - 837 |
Drilling and Completing Wells for High Productivity in the Point Mcintyre Field - Strategy, Implementation, and Verification Bloys JB, Murphy JW, Weingarten JS, Wheatall MW |
838 - 839 |
Multilateral Well Performance Prediction Salas JR, Clifford PJ, Jenkins DP |
840 - 841 |
Screenless Frac-Pack Completions with Resin-Coated Sand in the Gulf-of-Mexico Kirby RL, Clement CC, Asbill SW, Ely JW |
842 - 843 |
In-Situ Polymerization of an Inflatable Sleeve to Reline Damaged Tubing and Shut Off Perforations Saltel JL, Leighton J, Faure A, Baaijens T |
846 - 847 |
Slimhole Completion and Production Kroell E, Spoerker HF |
848 - 848 |
Results from the Heidrun Field Cased-Hole Gravel Packs Landrum WR, Burton RC, Mackinlay WN, Erlandsen A, Vigen A |